DYO: Detrend Price Oscillator example


Q:  Can you add DPO (Detrended Price Oscillator) to built-in studies?  The following link has the CORRECT calculation for DPO.  http://www.incrediblecharts.com/technical/dpo_construction.htm

A:  Period N for the moving average is the Number field on Line A.   Have the Bar Offset be  N/2 + 1 which would be a 6.  Line B plots the Close minus the average from Line A.    


Last modified 1/29/08 11:21 AM